Restraint Goal
-
AsphaltEdge is designed to allow for full and consistent material
thickness to the edge of the pavement.
- AsphaltEdge
helps prevent broken edges typical to traditional asphalt and
provides a maintainable, finished edge to your asphalt installation.
*Application
Overview
-
AsphaltEdge is anchored into the compacted base using 3/8”
x 10” spiral steel spikes.
-
Base (binder) course of asphalt is laid on compacted base following
AsphaltEdge installation instructions.
-
Finish course of asphalt is laid on base (binder) course following
AsphaltEdge installation instructions.
- Semi-compact
backfill material adjacent to the completed asphalt installation
providing additional support.
*Intended
as an overview only, please refer to specifier/ manufacturer technical
specifications.
Anchoring
3/8” x 10” spiral steel spikes anchored 4” to
12” on center depending on depth and compaction of base material.
- Anchor
at ends of each section in addition to guidelines indicated below.
-
For a shallow and/or loosely compacted base, 4” to 8”
on center spacing recommended.
- For
deeper and/or densely compacted base, 12” on center spacing
recommended.
AsphaltEdge Product:
AsphaltEdge product (height) is determined by the depth of the asphalt.
Example; 2-1/2” of asphalt = 2-1/2” AE. |