INSTALLATION
- Locate
all underground utilities and assure they will not interfere
with the edging installation. Layout border line of edging
with string or other means to assure border straightness
and curves as designed. Dig trench 4 1/2” deep.
- Rotate
alternating edging pieces and slide pieces together using
top and bottom “C” channels. Align end stake
holes for connection locking stake (Diagram A). Set edging
into trench with top at 1/2” above compacted finish
grade on turf side (Diagram B).
- Drive
stakes through pre-punched stake holes in edging. Requires
5 stakes evenly spaced for each 20 feet section. Be sure
to drive stake through overlapped end stake holes to ensure
a permanently locked connection.
- Backfill
both sides of edging, confirm that sections are securely
held together, and compact backfill material along edging
to provide top of edging at 1/2 inch above yard finish
grade. Cleanup and remove excess materials from site.