INSTALLATION
Connecting
Sections:
Connect adjacent sections by sliding a 2-3/4" (702mm)
sliding connector into the channel at the end of each section.
This should be done on both the wall and the base.(Diagram
A)
Completed
Installation: Diagram B represents a typical installation.
In this example the edging separates the growing media from
the ballast or pavers.
NOTE: When installing Aluminum edging
in direct contact with ACQ treated lumber we recommend installing
a barrier material such as Grace Vycor® Deck Protector™.
If
you have any additional questions, please contact us at
1.800.356.9660 or email
us. |