INSTALLATION

  1. Locate all underground utilities and assure they will not interfere with the edging installation. Layout border line of edging with string or other means to assure border straightness and curves as designed. Dig trench 3 3/4” deep.
  2. Rotate alternating edging pieces and slide pieces together using top and bottom channels. Slide edging together until sections overlap approximately 2". Set edging into trench with top at 1/2” above compacted finish grade on turf side (Diagram B).
  3. Drive stakes over the top of the edging to secure in place. Requires 2 stakes evenly spaced for each 4 foot section.
  4. Backfill both sides of edging, confirm that sections are securely held together, and compact backfill material along edging to provide top of edging at 1/2 inch above yard finish grade. Cleanup and remove excess materials from site.