INSTALLATION
- Locate
all underground utilities and assure they will not interfere
with the edging installation. Layout border line of edging
with string or other means to assure border straightness
and curves as designed. Dig trench 3 3/4” deep.
- Rotate
alternating edging pieces and slide pieces together using
top and bottom channels. Slide edging together until sections
overlap approximately 2". Set edging into trench
with top at 1/2” above compacted finish grade on
turf side (Diagram B).
- Drive
stakes over the top of the edging to secure in place.
Requires 2 stakes evenly spaced for each 4 foot section.
- Backfill
both sides of edging, confirm that sections are securely
held together, and compact backfill material along edging
to provide top of edging at 1/2 inch above yard finish
grade. Cleanup and remove excess materials from site.
If
you have any additional questions, please contact us at
1.800.356.9660 or email
us. |