PERMASTRIP
INSTALLATION INSTRUCTIONS
- Dig
landscape trench 1" (25mm) deeper than the edging being set.
- For
straight runs, the installer may want to run a string to serve
as a guide.
- Set
the edging into the landscape trench with the top 1/2" (12.5cm)
above what will become the compact finish grade.
- The
installer may want to install the entire straight run using stakes
that are half driven in to "tack" the PermaStrip in
place. This will allow the installer when standing back and viewing
the installation to make minor adjustments to achieve a perfectly
straight run.
- Start
at the beginning of the bed area and drive the stakes into their
locked position. (Diagram A)
- Connections
are made using the 4" Sliding Connector. (Diagram B)
Note: When using a Weed Fabric under stone be sure to lap the
fabric up the face of the PermaStrip. The weight of the stone
will pull the fabric partially down PermaStrip leaving you sufficient
coverage.
- At
the end of the bed area, cut the section to the desired length
and stake down. Begin your next bed area with the remaining portion
of the cut section.
- Forming
Angles: "V-notch" and/or cut the bottom of the edging
halfway up using a hacksaw. Bend up to the desired angle using
a hammer to stiffen angle. This forms a 1/2" radius on top
avoiding sharp corners.
NOTE:
When installing Aluminum edging in direct contact with ACQ treated
lumber we recommend installing a barrier material such as Grace
Vycor® Deck Protector™.
|
|