ONYX
INSTALLATION INSTRUCTIONS
Onyx
Landscape Edging installs quickly and easily in 4 simple steps.
- Locate
all underground utilities and assure they will not interfere with
the edging installation. Layout border line of edging with string
or other means to assure border straightness and curves as designed.
Dig trench 4 1/2” deep.
- Rotate
alternating edging pieces and slide pieces together using top
and bottom “C” channels. Align end stake holes for
connection locking stake. Set edging into trench with top at 1/2”
above compacted finish grade on turf side.
- Drive
stakes through pre-punched stake holes in edging. Requires 5 stakes
evenly spaced for each 20 feet section. Be sure to drive stake
through overlapped end stake holes to ensure a permanently locked
connection.
- Backfill
both sides of edging, confirm that sections are securely held
together, and compact backfill material along edging to provide
top of edging at 1/2 inch above yard finish grade. Cleanup and
remove excess materials from site.
|
|