CLEANLINE INSTALLATION INSTRUCTIONS

  1. Dig landscape trench 1” (25mm) deeper than the edging being set.

  2. Set the edging into the landscape trench with the top 1/2” (12.5cm) above what will become the compacted finish grade. (The installer can connect the adjacent sections of the edging prior to or after the sections are placed in the trench.) Where connections are needed on curves, the installer will find that connecting sections prior to installing will allow for faster completion.

  3. Start at the beginning of the bed area and begin driving the 12” (30.5cm) aluminum stakes. (NOTE: There are more loops per section than stakes. The additional loops are provided for greater versatility of staking based on the design and application.)

  4. Snap down the adjacent sections. (See Diagram A)

  5. At the end of the bed area, cut the section to the desired length and stake down. Begin your next bed area with the remaining portion of the cut section. (See Diagram B) FORMING ANGLES: Cut the bottom of the edging halfway up using a hacksaw, lay on a hard surface placing a brick or 4 x 4 over the cut. Bend up to the desired angle using a hammer to stiffen angle. This forms a 1/2” radius on top avoiding sharp corners.

    NOTE: When installing Aluminum edging in direct contact with ACQ treated lumber we recommend installing a barrier material such as Grace Vycor® Deck Protector™.

 

Home  |  Products  |  Applications  |  Company Info  |  Dealer Info  |  Contact Us
Why Edging?  |  Why Aluminum?  |  Why Permaloc?  |  Product Specs  |  Ease of Installation  |  References  
CleanLine   |  ProLine  |   YardEdge  |   Onyx   |   PermaStrip   |   DesignEdge   |   StructurEdge   |   BrickBlock   |   AsphaltEdge  |   AthletEdge  |  GeoEdge
Contractors  |  Architects and Designers  |  Do-It-Yourself

1 (800) 356-9660 (US & Canada) info@permaloc.com

©2005 Permaloc Corporation All Rights Reserved