CLEANLINE
INSTALLATION INSTRUCTIONS
- Dig
landscape trench 1 (25mm) deeper than the edging being set.
- Set
the edging into the landscape trench with the top 1/2 (12.5cm)
above what will become the compacted finish grade. (The installer
can connect the adjacent sections of the edging prior to or after
the sections are placed in the trench.) Where connections are
needed on curves, the installer will find that connecting sections
prior to installing will allow for faster completion.
- Start
at the beginning of the bed area and begin driving the 12
(30.5cm) aluminum stakes. (NOTE: There are more loops per section
than stakes. The additional loops are provided for greater versatility
of staking based on the design and application.)
- Snap
down the adjacent sections. (See Diagram A)
- At
the end of the bed area, cut the section to the desired length
and stake down. Begin your next bed area with the remaining portion
of the cut section. (See Diagram B) FORMING ANGLES: Cut the bottom
of the edging halfway up using a hacksaw, lay on a hard surface
placing a brick or 4 x 4 over the cut. Bend up to the desired
angle using a hammer to stiffen angle. This forms a 1/2
radius on top avoiding sharp corners.
NOTE:
When installing Aluminum edging in direct contact with ACQ treated
lumber we recommend installing a barrier material such as Grace
Vycor® Deck Protector™.
|
|