|
|
 |
BRICKBLOCK
INSTALLATION INSTRUCTIONS
- Remove
excess soils and all unstable subbase materials. Compact subgrade
to 95% proctor density test.
- Backfill
excavated area with appropriate depth aggregate material. The
base needs to be compacted in 2 - 3 lifts to achieve
proper density. The base needs to extend 6 to 12 beyond
the edge of the paver installation.
- Screed
concrete sand over the base to a uniform thickness of not less
than 1 and not more than 1-1/4.
- Install
Permaloc BrickBlock with the base resting on the aggregate and
facing away from the paver. (Diagram A.)
- Connections
to be made using the Quick Clip connectors. (Diagram B)
- Install
the pavers making sure that the pavers are 1/4" higher than
the desired final grade. Sweep fine sand into the joints.
- Make
several passes with a plate compactor with no less than 3,000-5,000
lbs. centrifugal compaction force and operates at 80 to 90 hertz.
Continue sweeping sand into the joints. Make several passes alternating
the direction of the compactor each time.
- Remove
excess sand from paver installation.
NOTE:
When installing Aluminum edging in direct contact with ACQ treated
lumber we recommend installing a barrier material such as Grace
Vycor® Deck Protector™.
|
|